No black box

Method and market data

A should-cost is what a well-run foundry in the chosen country needs to charge for your part. CastCalc builds it the way a foundry cost engineer does, block by block, with current market prices.

Market data

  • Metal and alloy prices from recognised market indices
  • Industrial electricity for 22 countries
  • Labour costs per country, reviewed regularly
  • Monthly update, checked by a foundry engineer

Free in every account: the Market Index with the monthly cost of a standard iron casting (GJL 150, GJS 400-15 and GJS 600-3 in 5 countries) and 15 raw material prices, plus the directory of 158 European iron foundries.

Free · Market IndexRaw materials, EUR/kg
  • FeMn (ferromanganese)
  • FeSi 75 (ferrosilicon)
  • Base iron
Raw materials, EUR/kg (DDP foundry), Jan to Sep 20260.51.01.52.0JanFebMarAprMayJunJulAugSepFeMn (ferromanganese), Jan 2026: €1.23/kgFeMn (ferromanganese), Feb 2026: €1.45/kgFeMn (ferromanganese), Mar 2026: €1.76/kgFeMn (ferromanganese), Apr 2026: €1.86/kgFeMn (ferromanganese), May 2026: €2.01/kgFeMn (ferromanganese), Jun 2026: €1.92/kgFeMn (ferromanganese), Jul 2026: €1.92/kgFeMn (ferromanganese), Aug 2026: €1.90/kgFeMn (ferromanganese), Sep 2026: €1.98/kgFeMn €1.98FeSi 75 (ferrosilicon), Jan 2026: €1.67/kgFeSi 75 (ferrosilicon), Feb 2026: €1.50/kgFeSi 75 (ferrosilicon), Mar 2026: €1.55/kgFeSi 75 (ferrosilicon), Apr 2026: €1.67/kgFeSi 75 (ferrosilicon), May 2026: €1.51/kgFeSi 75 (ferrosilicon), Jun 2026: €1.53/kgFeSi 75 (ferrosilicon), Jul 2026: €1.53/kgFeSi 75 (ferrosilicon), Aug 2026: €1.52/kgFeSi 75 (ferrosilicon), Sep 2026: €1.67/kgFeSi 75 €1.67Base iron, Jan 2026: €0.43/kgBase iron, Feb 2026: €0.44/kgBase iron, Mar 2026: €0.45/kgBase iron, Apr 2026: €0.51/kgBase iron, May 2026: €0.47/kgBase iron, Jun 2026: €0.47/kgBase iron, Jul 2026: €0.47/kgBase iron, Aug 2026: €0.46/kgBase iron, Sep 2026: €0.46/kgBase iron €0.46Raw materials, EUR/kg (DDP foundry), Jan to Sep 20260.51.01.52.0JanMarMayJulSepFeMn (ferromanganese), Jan 2026: €1.23/kgFeMn (ferromanganese), Feb 2026: €1.45/kgFeMn (ferromanganese), Mar 2026: €1.76/kgFeMn (ferromanganese), Apr 2026: €1.86/kgFeMn (ferromanganese), May 2026: €2.01/kgFeMn (ferromanganese), Jun 2026: €1.92/kgFeMn (ferromanganese), Jul 2026: €1.92/kgFeMn (ferromanganese), Aug 2026: €1.90/kgFeMn (ferromanganese), Sep 2026: €1.98/kgFeMnFeSi 75 (ferrosilicon), Jan 2026: €1.67/kgFeSi 75 (ferrosilicon), Feb 2026: €1.50/kgFeSi 75 (ferrosilicon), Mar 2026: €1.55/kgFeSi 75 (ferrosilicon), Apr 2026: €1.67/kgFeSi 75 (ferrosilicon), May 2026: €1.51/kgFeSi 75 (ferrosilicon), Jun 2026: €1.53/kgFeSi 75 (ferrosilicon), Jul 2026: €1.53/kgFeSi 75 (ferrosilicon), Aug 2026: €1.52/kgFeSi 75 (ferrosilicon), Sep 2026: €1.67/kgFeSi 75Base iron, Jan 2026: €0.43/kgBase iron, Feb 2026: €0.44/kgBase iron, Mar 2026: €0.45/kgBase iron, Apr 2026: €0.51/kgBase iron, May 2026: €0.47/kgBase iron, Jun 2026: €0.47/kgBase iron, Jul 2026: €0.47/kgBase iron, Aug 2026: €0.46/kgBase iron, Sep 2026: €0.46/kgBase iron

Monthly prices Jan–Sep 2026, from the CastCalc Market Index (3 of 15 raw materials shown).

The 8 cost blocks

Every should-cost is split into the same 8 blocks, so you can compare it line by line with a supplier's breakdown.

The 8 cost blocks and what each covers
Cost blockWhat it covers
MetalThe charge materials and alloys for your grade.
Sand, cores & consumablesMoulding sand, cores, coatings, filters, feeders and other consumables used per mould.
EnergyElectricity for melting and for running the plant.
LabourThe moulding, pouring and finishing work on each casting.
Heat treatmentTreatment of the casting, only when the part needs it.
EquipmentThe moulding line and pattern equipment the part uses.
OverheadPlant overhead, quality and logistics.
ProfitThe foundry's margin.

Your inputs, your supplier

Describe the part (weight, grade, moulding line, complexity, cores, quantity) and the foundry's country. Advanced settings let you mirror a specific supplier's setup and test what their quote assumes.

Accuracy

In a customer case in Italy the CastCalc benchmark landed within 5% of actual supplier pricing. Accuracy depends on how well the inputs describe the part and the foundry. Every result shows the month of its data.